A model for quantification of environmental risk in mining ventures

Authors

  • Felipe Ribeiro Souza
  • Tiago Mozart
  • Mariana Caroline Andrade Silva
  • Hernani Mota de Lima

DOI:

https://doi.org/10.54033/cadpedv21n3-121

Keywords:

Environmental Reclamation, Mine Closing, Natural Underground Cavities, Real Options Theory, Theory Of Discounted Cash Flow

Abstract

The premature termination of industrial projects, often triggered by insufficient revenue generation to cover liabilities, poses a significant challenge in project evaluation. Although the conventional discounted cash flow (DCF) method remains widely used, its inability to account for project failure probabilities can lead to resource misallocation. This study aims to address this limitation by applying real options theory to assess the risk of premature abandonment within the context of a mineral extraction project. In this proposed system, fluctuations in environmental remediation costs are modelled by considering the cumulative probabilities of cost increases or decreases at each time step. The simulated project value reflects the cumulative activities required for mine closure, where each ton of extracted ore generates an environmental liability demanding remediation. Through the application of this system, the study demonstrates its effectiveness in identifying an escalating probability of project closure over time. Particularly, the findings reveal the existence of a critical threshold date. Beyond this date, any operational suspension exceeding one year renders project closure the economically optimal choice. This closure encompasses all necessary environmental restoration activities. By integrating real options theory into project evaluation, this study offers a more comprehensive approach to assessing the risk of premature project abandonment in mineral extraction projects. Through the consideration of fluctuating environmental remediation costs and the cumulative probabilities of project closure, it provides valuable insights for decision-making in project management and resource allocation. The trigger curve generated allowed for the identification of the viability threshold of the venture. Identifying the threshold to initiate the mining closure project.

References

Topal E. Evaluation of a mining project using Discounted Cash Flow analy-sis, Decision Tree analysis, Monte Carlo Simulation and Real Options using an ex-ample. International Journal of Mining and Mineral Engineering, 2008; 62–76. https://doi.org/10.1504/IJMME.2008.020457

Rico M, Benito G, Salgueiro AR, Díez-Herrero A, Pereira HG. Reported tail-ings dam failures. A review of the European incidents in the worldwide context. Journal of Hazardous Materials, 152(2), 2008; 846–852. https://doi.org/10.1016/j.jhazmat.2007.07.050

Armstrong M, Petter R, Why have so many tailings dams failed in recent years?, Resources Policy, 2019, 63(4), https://doi.org/10.1016/j.resourpol.2019.101412.

Brennan MJ, Schwartz ES. Evaluating Natural Resource Investments. The Journal of Business, 1985, 58(2); 135. https://doi.org/10.1086/296288

Cortazar G, Casassus J. Optimal timing of a mine expansion: Implementing a real options model. Quarterly Review of Economics and Finance, 1998, 38(3 Part.1); 755–769. https://doi.org/10.1016/s1062-9769(99)80100-8

Maier S. Re-evaluating natural resource investments under uncertainty: An alternative to limited traditional approaches. Annals of Operations Research; 2020.

Dias MAG. Análise de Investimentos com opções reais - teoria e prática com aplicações em petróleo e outros setores, V1 (1st ed.). Editora Interciência; 2014.

Trigeorgis L. Real Options: Managerial Flexibility and Strategy in Resource Allocation (Mit Press (ed.); 1st ed.);1996.

Dias MAG, Teixeira JP. Continuous-Time Option Games: Review of Models and Extensions. Multinational Finance Journal, 14, 219–254; 2010.

Dias MAG. Análise de Investimentos com opções reais - teoria e prática com aplicações em petróleo e outros setores, V. 2 (2nd ed.). Editora Interciência; 2015.

Moel A, Tufano P. When Are Real Options Exercised? An Empirical Study of Mine Closings. SSRN Electronic Journal; 2005. https://doi.org/10.2139/ssrn.233800

Black F, Scholes M. The pricing of options and corporate liabilities. Journal of Political Economy, 1973; 637–657. https://doi.org/10.1086/260062

Ergas H, Small JP. Real Options and Economic Depreciation. March; 2000.

Battauz A, De Donno M, Sbuelz A. Real options and American derivatives: The double continuation region. Management Science, 2015; 1094–1107

Hazra T, Samanta B, Dey K. Real option valuation of an Indian iron ore de-posit through system dynamics model. Resources Policy, 60(December 2018), 288–299. https://doi.org/10.1016/j.resourpol.2019.01.002

Jyrki Savolainen, Real options in metal mining project valuation: Review of literature, Resources Policy, 2016, 50, 49-65, https://doi.org/10.1016/j.resourpol.2016.08.007

Zhang K, Nieto A, Kleit A N. The real option value of mining operations using mean-reverting commodity prices. Mineral Economics, 2015, 28(1–2), 11–22; https://doi.org/10.1007/s13563-014-0048-6

Santos GA. Análise de Tensão Deformação e por Equilíbrio Limite do Meca-nismo de Tombamento Flexural. UFOP; 2008.

Brasil. Instrução Normativa N 01, de 24 de Janeiro de 2017; 2017.

Souza FR, Burgarelli HR, Nader A S, Ortiz CEA, Chaves LS, Carvalho LA, Torres VFN, Câmara TR, Galery R. Direct block scheduling technology: Analysis of Avidity. REM - International Engineering Journal, 2018, 71(1); 97–104. https://doi.org/10.1590/0370-44672017710129

Published

2024-03-20

How to Cite

Souza, F. R., Mozart, T., Silva, M. C. A., & Lima, H. M. de. (2024). A model for quantification of environmental risk in mining ventures. Caderno Pedagógico, 21(3), e3264. https://doi.org/10.54033/cadpedv21n3-121

Issue

Section

Articles